Modular Home Builder Task List
Task List
|
Project |
Estimate $ |
Actual $ |
|
Land Cost |
|
|
|
Engineering Costs |
|
|
|
Building Permits |
|
|
|
Bank Fees |
|
|
|
Legal Expenses |
|
|
|
Special Fees |
|
|
|
Site |
Estimate $ |
Actual $ |
|
Clearing |
|
|
|
Blasting |
|
|
|
Excavation |
|
|
|
Backfill & Grade |
|
|
|
Haul off material |
|
|
|
Additional material |
|
|
|
Driveway |
|
|
|
Landscape |
|
|
|
Underground utilities |
|
|
|
Other |
|
|
|
Foundation |
Estimate $ |
Actual $ |
|
Footings |
|
|
|
Walls |
|
|
|
Slab / Floor |
|
|
|
Damp-proofing / Sealer |
|
|
|
Basement Windows |
|
|
|
Kneewalls |
|
|
|
Sill Plate (Double) |
|
|
|
Lally Columns |
|
|
|
Bulkhead |
|
|
|
Perimeter Drains |
|
|
|
Sump Pump |
|
|
|
Wall Insulation |
|
|
|
Other |
|
|
|
Modular |
Estimate $ |
Actual $ |
|
Drop/Set/WT |
|
|
|
Exterior Finish Work |
|
|
|
Roofing |
|
|
|
Gable Ends |
|
|
|
Siding |
|
|
|
Painting (walls, finish) |
|
|
|
Attach ship loose items (dormers, etc.) |
|
|
|
Gutters |
|
|
|
Interior Finish Work |
|
|
|
Trim Mate Wall Openings |
|
|
|
Trim Ceiling / Wall Areas |
|
|
|
Finish Stairways |
|
|
|
Basement Stairs |
|
|
|
Basement Insulation |
|
|
|
Rails |
|
|
|
Flooring Fillers |
|
|
|
Flooring (if done locally) |
|
|
|
Drywall Work |
|
|
|
Complete Moldings |
|
|
|
Painting (trim) |
|
|
|
Other |
|
|
|
Utilities |
Estimate $ |
Actual $ |
|
City Water or Well |
|
|
|
City Sewer or Septic |
|
|
|
Gas Service |
|
|
|
Utility Poles |
|
|
|
Utilities |
|
|
|
Percolation Test |
|
|
|
Water Quality Test |
|
|
|
Telephone |
|
|
|
Cable / Satellite |
|
|
|
Other |
|
|
|
Add-ons |
Estimate $ |
Actual $ |
|
Exterior Stairs |
|
|
|
Decks |
|
|
|
Porches |
|
|
|
Garages |
|
|
|
Finish Upper Levels (Capes/Chalets |
|
|
|
Finish Lower Levels (Split/Bi-levels) |
|
|
|
Fireplace / Stacks |
|
|
|
Other |
|